Place of Origin: | CHINA |
---|---|
Brand Name: | GRH |
Model Number: | XY-H9011-9015 |
Minimum Order Quantity: | 1000 PCS |
Price: | Negotiable(very competitive) |
Packaging Details: | One set includes 8 plastic panels, 16 zinc alloy grippers, 2 long iron tubes (168cm), 2 short iron tubes (38cm), and 8 plastic tube sleeves. |
Delivery Time: | 20 days to 40 days after receive the deposit |
Payment Terms: | L/C, D/P, T/T at sight. |
Supply Ability: | 1000000 pieces per month |
Material: | Zinc Alloys, Iron And Plastics | Color: | Dark Gold, Light Gold, Dark Bronze, Light Bronze, Silver |
---|---|---|---|
Suitable For: | Funeral Products | Used For: | Coffin Bearing |
Highlight: | funeral accessories,funeral products |
Q: May I have samples?
A: Yes, of course. If just a few samples, we will send freely and freight collect. You just need to tell me consignee’s contact information and courier account Number. If you don’t have a courier account, you can pay to our account and we will pay for you.
Q: Can you make other shape in appointed color for me?
A: Yes, of course if you can provide us detailed specification or send sample to us directly.
Q: Can I use our own designed package?
A: Yes, size, color, logo and packaging style of product are customized.
Q: What’s your MOQ?
A: Normally, 7200sets/item. If more than 5 items in one shipment, 5000sets/item, if over 10 items in one shipment, 3000sets/item. We also warm welcome any trial order whose QTY less is than our MOQ.
Q: When’s your delivery time?
A: Generally, 3-5days for samples, within 30 days for mass production.
Our services:
(1) Products can be customized according to customer's samples;
(2) Provide free samples for testing;
(3) Production according to customers'requirements for different materials and colors of products;
Product Name | Metal Coffin Accessories |
Item No. | XY-H9011-H9015 |
Brand Name | GRH |
Material | Zinc Alloys, Iron and Plastics |
Color | Dark gold, light gold, dark bronze, light bronze, Silver |
Package | One set includes 8 plastic panels, 16 zinc alloy grippers, 2 long iron pipes (168cm), 2 short iron pipes (38cm), and 8 plastic pipe sleeves. |
Trade term | FOB Guangzhou/ FOB Shenzhen etc. |
Samples lead time | Within 7 days |
Delivery date | Within 30 days after confirming your PO with deposit |
Payment term | 30% deposit by TT, balance against the copy of shipping documents |
MOQ | 1000 PCS |
Country of origin | CHINA |